    Project Case Study

    Master Bathroom Remodel — Destrehan, LA

    A full gut and rebuild of a master bath in a two-story Destrehan home — including dust containment, plumbing rough-in, RedGard waterproofing, and a new tile shower system.

    Project Background

    The homeowners reached out to Cajun Home Services after years of frustration with an aging master bathroom in their two-story brick and stucco home in Destrehan. The original tile shower had hairline grout failures, the marble floor tile had cracked along a slab seam, and the legacy plumbing valves were past their service life. They wanted a complete rebuild — not a cosmetic refresh.

    We scoped this as a full master bathroom gut remodel: down to studs and slab, with new plumbing rough-in, modern waterproofing, and a rebuilt tile shower system. Because the homeowners were living in the house during construction, dust control and containment were treated as first-class deliverables — not an afterthought.

    Destrehan sits in St. Charles Parish along the Mississippi River corridor, where high humidity and slab-on-grade construction make proper waterproofing and substrate detailing critical. A bathroom built to a Louisiana standard has to handle moisture from both directions — interior shower spray and exterior vapor drive.

    Scope of Work

    • Full demolition of existing tile shower stall, marble floor tile, fixtures, and finishes
    • Plastic containment with zippered access to isolate the master bath from the rest of the home
    • HEPA dust extraction during all hammer-drill tile removal to keep the home livable
    • Plumbing rough-in inspection and replacement of legacy shower valves
    • New pressure-treated shower curb framing and cement board substrate over the slab
    • Full RedGard waterproofing membrane on shower walls and curb
    • Tile rebuild with modern shower system, drain, and updated fixtures

    Build Sequence

    This project was managed through our standard JobTread workflow — daily photo updates, scheduled inspections, and a single point of contact for the homeowners throughout the build.

    Phase 1 — Containment & Demo Prep

    Before a single tile was broken, we sealed off the bathroom doorway with plastic sheeting and a zippered access panel. The adjacent bedroom and hallway were protected with floor runners. This wasn't a 'we'll clean it up after' job — the homeowners were sleeping 15 feet away, and the containment had to hold for the entire demo phase.

    Phase 2 — Shower & Floor Demo

    The existing tile shower was stripped to wall studs, exposing the original plumbing valves, ceiling joists, and insulation. The marble floor tile was removed using a rotary hammer paired with a HEPA dust extraction vacuum — and our crew worked in respirators throughout. This is the part of a remodel most contractors skip on; we treat it as a safety and trust line item.

    Phase 3 — Plumbing & Substrate Rebuild

    With the cavity fully exposed, we inspected the existing plumbing rough-in and replaced the legacy shower valve assembly. New pressure-treated lumber was used to frame the shower curb, and cement board was installed over the slab and shower walls as the substrate for waterproofing and tile.

    Phase 4 — Waterproofing

    RedGard liquid waterproofing membrane was applied in two coats over the cement board and shower curb. In Louisiana's humidity, a properly waterproofed shower assembly is the single most important detail — it's what separates a 20-year shower from a 5-year mold problem. The membrane was inspected and photo-documented before any tile work began.

    Phase 5 — Tile, Fixtures & Finish

    New tile was installed over the waterproofed substrate, fixtures were set, and the shower system was tested. Final cleanup included removing all containment, vacuuming the cavity, and a homeowner walk-through to verify scope completion.

    Materials & Systems Used

    Containment

    Plastic sheeting with zippered doorway access + floor protection

    Dust Control

    Rotary hammer paired with HEPA dust extraction vacuum

    PPE

    Half-face respirators worn during all demo phases

    Substrate

    Cement board over slab and shower walls

    Curb Framing

    Pressure-treated lumber, mechanically fastened

    Waterproofing

    RedGard liquid membrane — two coats, fully inspected

    Plumbing

    New shower mixing valve replacing legacy assembly

    Documentation

    JobTread daily photo updates throughout build

    Why Containment & Waterproofing Matter

    Most bathroom remodel complaints we hear from homeowners switching contractors fall into two buckets: "the dust got everywhere" and "the shower started leaking after a year." Both are preventable, and both are decisions made on day one of demo — not at finish.

    Zippered plastic containment costs us a few hundred dollars in materials and an hour of labor. It's the difference between a homeowner sleeping comfortably during their remodel and a homeowner replacing HVAC filters every week. RedGard waterproofing adds a few hundred dollars to the substrate phase and prevents the single most common failure mode in residential bathrooms — water tracking through grout joints into the wall cavity.

    Both of those decisions are made before the homeowner ever sees the finished tile. That's why we document every phase with timestamped photos — so you can verify the work behind the wall, not just the work in front of it.

    Lessons for Homeowners

    If you're planning a master bath remodel in St. Charles Parish, New Orleans, Metairie, or anywhere in Southeast Louisiana, ask three questions of every contractor you interview:

    1. What does your dust containment look like? If the answer is "tarps," keep interviewing.
    2. What waterproofing system do you use, and can I see it before tile goes on? RedGard, Schluter Kerdi, and Hydro Ban are all acceptable. "We just use cement board" is not.
    3. Will I get daily photos? If the contractor disappears for days at a time, you have no way to verify what's happening behind the wall.

    📸 Want to see more bathroom remodel projects?

    Browse our full bathroom remodeling portfolio across Destrehan, Metairie, Gretna, and the New Orleans metro area.

    See All Bathroom Remodel Projects →

    Project Details

    Location

    Destrehan, St. Charles Parish, LA

    Home Type

    Two-story brick & stucco residential, slab-on-grade

    Scope

    Full master bath gut & rebuild — demo, plumbing, waterproofing, tile

    Waterproofing

    RedGard liquid membrane, two-coat application on cement board substrate

    Containment

    Zippered plastic doorway + HEPA dust extraction during demo

    Documentation

    Daily JobTread photo updates, all phases

    Plan Your Bathroom Remodel

    Considering a master bath rebuild? Call our New Orleans office for a free in-home consultation and detailed proposal.

    504-336-2444Request Estimate Online

    Project Photos — Build Sequence

    Follow this Destrehan master bath from containment and demo through waterproofing and rebuild.

    Two-story brick and stucco home exterior in Destrehan Louisiana with Cajun Home Services dump trailer parked in front during master bathroom remodel project in St. Charles Parish

    Day 1 — Project Start, Cajun Trailer On Site

    Zippered plastic doorway containment with red zipper isolating master bathroom from bedroom during dust control on Destrehan LA remodel

    Zippered Doorway Containment — Dust Control

    Master bathroom with shower walls removed and floor tile prepped for replacement during full remodel in Destrehan Louisiana with plastic containment isolating adjacent rooms

    Plastic Containment & Floor Tile Prep

    Cajun Home Services crew prepping mortar and demoing tile inside master bathroom with halogen work light and tub visible during Destrehan LA remodel

    Mortar Prep & Interior Tile Demo

    Master bathroom demolition with shower stall removed exposing wall framing and plumbing rough-in during remodel in Destrehan LA St. Charles Parish

    Shower Stall Demo — Framing Exposed

    Master bathroom shower stall fully gutted to studs exposing original plumbing valves insulation and ceiling joists during Destrehan LA renovation

    Full Gut to Studs — Legacy Valves Exposed

    Cajun crew member in respirator using rotary hammer to break up old marble floor tile during master bath demolition in Destrehan Louisiana

    Rotary Hammer Floor Tile Demo — Full PPE

    Cajun Home Services crew member in respirator using rotary hammer with dust extraction vacuum to remove old marble floor tile during master bath remodel in Destrehan LA

    Rotary Hammer Tile Removal w/ HEPA Extraction

    New pressure-treated shower curb framing and cement board installation over concrete slab with exposed insulation behind during Destrehan LA master bath rebuild

    New Shower Curb & Cement Board Substrate

    Cajun Home Services crew applying RedGard waterproofing membrane to shower walls during master bath remodel in Destrehan Louisiana

    RedGard Waterproofing Membrane Applied

    Cajun Home Services repeat customer master bathroom remodel progress photo 16 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 16

    Cajun Home Services repeat customer master bathroom remodel progress photo 17 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 17

    Cajun Home Services repeat customer master bathroom remodel progress photo 18 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 18

    Cajun Home Services repeat customer master bathroom remodel progress photo 19 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 19

    Cajun Home Services repeat customer master bathroom remodel progress photo 20 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 20

    Cajun Home Services repeat customer master bathroom remodel progress photo 21 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 21

    Cajun Home Services repeat customer master bathroom remodel progress photo 22 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 22

    Cajun Home Services repeat customer master bathroom remodel progress photo 23 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 23

    Cajun Home Services repeat customer master bathroom remodel progress photo 24 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 24

    Cajun Home Services repeat customer master bathroom remodel progress photo 25 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 25

    Cajun Home Services repeat customer master bathroom remodel progress photo 26 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 26

    Cajun Home Services repeat customer master bathroom remodel progress photo 27 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 27

    Cajun Home Services repeat customer master bathroom remodel progress photo 28 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 28

    Cajun Home Services repeat customer master bathroom remodel progress photo 29 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 29

    Cajun Home Services repeat customer master bathroom remodel progress photo 30 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 30

    Cajun Home Services repeat customer master bathroom remodel progress photo 31 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 31

    Cajun Home Services repeat customer master bathroom remodel progress photo 32 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 32

    Cajun Home Services repeat customer master bathroom remodel progress photo 33 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 33

    Cajun Home Services repeat customer master bathroom remodel progress photo 34 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 34

    Cajun Home Services repeat customer master bathroom remodel progress photo 35 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 35

    Cajun Home Services repeat customer master bathroom remodel progress photo 36 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 36

    Cajun Home Services repeat customer master bathroom remodel progress photo 37 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 37

    Cajun Home Services repeat customer master bathroom remodel progress photo 38 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 38

    Cajun Home Services repeat customer master bathroom remodel progress photo 39 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 39

    Cajun Home Services repeat customer master bathroom remodel progress photo 40 in Destrehan, St. Charles Parish, Louisiana — full gut, waterproofing, tile rebuild documentation

    Build Progress — Photo 40

    Watch a Related Destrehan Bathroom Project

    Tub leak repair and travertine tile upgrade in another St. Charles Parish home.

    Ready to Rebuild Your Master Bath?

    From dust containment to RedGard waterproofing to finished tile — we document every phase. Call (504) 336-2444 for a free consultation.